About us
   Products 
   Operating environment
   Construction
   Setting up floor
   Accessorial Products
   Engineering examples
   Product test
   Guest Book
   Contact us

   
   Home -->>Antistatic flooring series
 
Requirements on maintenance and application
1.
Operating environment:The temperature in the room to be laid with antistatic floorings sh-
all be 15°-35°C and the relative humidity is 45% - 75%.If the humidity of computer rooms
is low for a long time,there may be cracks on the floor sur face and the strength and thi-
chness of attaching veneer shall be increased therefore.
2.
Maintenance requirements:    
  (1)It is forbidden to directly use sharp tools to carry out construction on the floor sur-
face in order to avoid the damages to the appearance and antistatic performance of floor-
ing surface;
  (2)During application, no person is allowed to jump onto the floor from high position, and
it is forbidden to crudely remove equipment as such iperation may damage the floor;
  (3)When equipment is moved on access floor, it is forbiden to directly pull the equipment on floor as it may scuff the floor;the equipment shall be lifed before moving;
  (4)When heavy equipment is to be installed in machine room,it shall be directly placed on base frame;i.e. it is forbidden to directly place the heavy equipment on floor as deformation may be saused by long-term load bearing;
  (5)To repair the equipment under floor, board sucker shall be first used to remove floor-
ing;it is forbidden to use sharp tools to crudely dismantle and assemble the flooring;
  (6)Dring maintenance,dust collector or mop can be used to keep the floor clean. Particul-
arly,measures shall be taken to avoid sprinkling liquid ont floor;
   
       
 Address:Beijing·china
 Beijing AnChuang ZhongKe Computer-room Equipment Co.,Ltd.
 Tel:+086-01-62977585 62810769 Postcode:100094
 Fax:+086-01-62897486 Website:www.anchuang.com
Copyright©2004-2005 AnChuang.com, All Rights Reserved
 E-mail:sales@anchuang.com